November 26th
Home Expense Log Floor Plan Thoughts Reference Links About Us


Follow Our Progress

November 26th 2003

We got a lot of things done today that have been hanging over my head to some degree.  I've been feeling a bit overwhelmed and a bit down lately.  We're all still a bit under the weather from the cold we all got and it has finally taken it's toll on me at least...


We stopped off at the home improvement store for a sheet of foil backed insulation.  On the way home the front edge got some lift and we ended up with a very nice "L" shaped piece when we got to the bus.

I thought it was pretty funny, so I just had to take a picture and post it here...

Usually we get more that 1 piece at a time or load a piece of plywood on top, but I thought that if we took it slow it would be fine.  Oh well, no harm done.


Becky helped me clean off the rubber for the "D" windows and we glued them back in place with some glue I got from the auto glass shop...

I got tired of waiting for them to come out to the bus to work on the windows with me.  When I went down to their store a couple of weeks ago they said that they were going to come out to the bus to take a look at all of the windows and give me an estimate to fix all of the larger windows and help me re-install the "D" windows.

I find that a lot of the time people do not follow through, so I picked up some window sealant while I was there.  I'm glad I did.  I didn't do a pretty job, but they definitely will not leak and nobody will notice my sloppy work since it will be hidden behind the walls.


The back window of the bus got a layer of insulating foam to help keep the back room warmer.  It's been a pain in the neck to try to get that back room comfortable since the temperatures dropped.

You can't really tell, but we also added a layer of plastic sheeting to the windows to seal out the air leaks.

It made a huge difference.  Now the majority of the cold can be felt coming from the metal compartment that houses the air conditioning condenser.  We plan to deal with that in the near future too...


I finished up some wiring next to the refrigerator.  We wanted to get 12V, cable and a phone line installed before insulating and sheeting the wall.

We are planning to stay home for Thanksgiving.  There's a lot of cooking and relaxing that needs to be done.


Back Up Next

Home ] Expense Log ] Floor Plan ] Thoughts ] Reference ] Links ] About Us ]

Copyright 2003 the Virtual Placebo Group.  All rights reserved.
For questions or comments about this web site, please e-mail busnuts@virtualplacebo.com