February 27th
Home Expense Log Floor Plan Thoughts Reference Links About Us


Follow Our Progress

February 27th 2004

It took most of the day to get the small cabinet along the side of the bus constructed.  I had to reroute all of the DC wiring for the solar charge controller through the wall so that the charge controller could be monitored.  While I was at it, I did some work to clean up the wiring for the water pump, DC light and power TV antenna.  

In this picture I still have not put the top on the cabinet.  

Emily has really been enjoying the bus lately.  Up until the last week or so she has been telling us that she wants to keep the house and her old room.  Now that the bus is finally beginning to look a bit less "rough" she's been begging us to let her stay over night in the bus and seems to feel more at home in the bus than at the house.

The house is basically empty now.  Most of our stuff has migrated to boxes in various piles.  Almost everything is in the downstairs living room now awaiting the big move into the bus.

Here's a close up of the the charge controller and display/control panel for the inverter.

At the rate that we're getting things done now, we should be able to stick to our goal of getting packed up and out of here by the middle of next week.  There's still a lot to get done though...


Back Up Next

Home ] Expense Log ] Floor Plan ] Thoughts ] Reference ] Links ] About Us ]

Copyright 2003 the Virtual Placebo Group.  All rights reserved.
For questions or comments about this web site, please e-mail busnuts@virtualplacebo.com